A single window for a region's construction permits
Every builder worked it out alone, and bottlenecks were invisible
Building housing means going through the environmental authority, utility companies, planning offices, permit offices and the land registry. Each agency has its own requirements and timelines, and every builder figured them out alone.
When a procedure got stuck, nobody outside the builder knew until the site stopped. There was no overall view to sit down with the agencies and solve it.
Catalog, case follow-up and dashboards in one portal
- /01
Procedure catalog by phase
Procedures ordered by project stage —preliminary, licensing, construction and handover— with the agency and what each one requires.
- /02
AI assistant
Answers where to start and which documents each agency asks for, and guides filing step by step.
- /03
Case log
Every bottleneck with an agency is logged, worked and closed, escalated when needed through formal petitions.
- /04
Dashboards for the follow-up table
Active projects, housing units and estimated jobs by municipality, plus the table's indicators live.
Figures taken from the systems in operation as of November 13, 2026.
What we built
- 1Public portal
- 2Procedure catalog
- 3AI assistant
- 4Case log
- 5Dashboards